Recorded Webinar

Preparing, Presenting, and Challenging Delay Claims

Duration: 90 minutes Speaker: Fritz T. Marth, PE, CFCC

Available On-Demand

PURCHASE OPTIONS

Individual Purchase Options
On-Demand
Available On-Demand. Watch the webinar recording multiple times for 30 days.
$189
Recording
Download link will be emailed for single user access with handouts. Available in 3-5 business days, after Live Event. Never Expires.
$219
Transcript (PDF)
PDF transcript of webinar with handouts will be emailed. Available in 7-10 business days, after Live Event. Never Expires.
$179
ABOUT THE EVENT

Delays are an inevitable and potentially costly part of the construction process.  If the costs are high enough, and disputes over responsibility for the delays arise, a delay claim ensues.  Knowing how to properly quantify the delay and the costs associated therewith is fundamental for not only recovering damages, but also for properly evaluating any damages potentially owed.  In this webinar, we will look at the major components of a delay claim – delay and damages – and the various categories and components of each, and what is necessary for their determination and proof.

This webinar will cover:

  • Industry and legal standards relative to schedule delay analysis
  • Necessary project records
  • Appropriate schedule analysis methodology
  • Implementation of a schedule delay analysis
  • Categories of delay damages and their components
  • How damages are quantified/calculated

By attending this webinar, the attendee will develop a fundamental understanding of:

  • Industry and legal standards relative to delay analysis
  • Types of schedule used during the project
  • The preparation and purpose of the as-planned schedule, schedule updates, and the as-built schedule
  • How to perform a CPM schedule delay analysis
  • The costs experienced by each project stakeholder
  • The appropriate way to calculate each type of delay cost
  • Potential hurdles to recovery

Who Will Benefit

  • Construction Attorneys
  • Construction Company Executives
  • Contractors’ Project Management Staff
  • Construction Schedulers
  • Subcontractors
  • Construction Managers
  • Project Owners and Sponsors
267e8433fc9abd9f1289ffe10c593e2e.jpg
Fritz T. Marth, PE, CFCC

Fritz Marth joined GREYHAWK in 2008. He has over 25 years of experience in the construction industry specializing in disputes and claims resolution, critical path method scheduling and delay analysis, cost damages analysis, and litigation support. Fritz’s experience involves in a wide variety of projects including highways and bridges, airports and rail stations, water and wastewater treatment facilities, landfills, hospitals and health care facilities, stadiums and arenas, and hotels and apartment buildings. He has also served as a testifying expert in this regard.

Fritz received his Bachelor and Master of Science Degrees in Civil Engineering from Drexel University. He is a licensed Professional Engineer and Certified Forensic Claims Consultant, and a member of the American Society of Civil Engineers, the Association for the Advancement of Cost Engineering International, and the American Bar Association.

In addition, Fritz has been involved in the on-site construction management and administration of several large public projects involving the construction of highways, highway bridges, railroads, and railroad stations; and, has performed residential construction work including home construction and renovations.

Fritz had led claims analysis efforts on more than $1 billion of construction projects. His efforts have included the creation of detailed as-built schedules, establishment of the as-built critical path to project completion, identification of project impacts and critical delays, determination of responsibility for issues and impacts, and calculation of cost damages incurred. He has performed analyses on behalf contractors, public and private owners and developers, and design professionals.

Access Unlimited Webinars

SUBSCRIBE NOW
Why You Should Subscribe?
Unlimited Live and On-Demand Courses

Watch all live or recorded webinars (up to 120 minutes long). Get instant access to a library of more than 500 high quality courses presented by best-in-class presenters.

CEUs: APA, CPE, SHRM and HRCI Credits

Fulfil your recertification requirements by earning CEUs from APA, CPE, SHRM and HRCI.

Free Access to Course Materials

Each program comes with Additional Course Materials, which you can download and read anytime.

Additional Discounts

Get flat 20% discount on Premium Product Category like, Long Hour Webinars.

Call Now At

888-527-3477


Subjects: Construction

Testimonials

What people are saying about us


Donald

Client

Loved the cartoons. Made it easy to understand.


Lucious Cameron

Client

The subject matter was very interesting and the instructor was well informed. Content of the webinar was Very Helpful!


Maria

Client

Gwen was fantastic and the material was very informative.


David

Client

The instructor's ability to explain different findings and her ability to relate to them. Her knowledge and experience are game-changer and will help us keep a high score.


Elizabeth Jeffery

Client

The speaker was extremely knowledgeable. Speaker moved the program forward at a good pace. The time flew by.


Mike

Client

Kathi is a great trainer. I was informed on all the things I need to look at when doing my walk through and preparing for the inspection.

Get Unlimited Webinars, Starting $799 only!
  • Unlimited Live and On-Demand Webinars (Up to 120 Minutes Long)
  • Unlimited Course Materials
  • CEUs: APA, CPE, SHRM and HRCI
  • 20% Discount on Long Hour Webinars
  • Certificate of Participation
Choose Membership

Similar Events

https://www.complianceprime.com/uploads/img_upload/1734613313_b52cd0f6720de185fe87.png
https://www.complianceprime.com/uploads/img_upload/45768fddc95f95a0e0108ccb242bdd72.jpg
https://www.complianceprime.com/uploads/img_upload/1724847136_8b5996d557499f16f91e.png

Sep 25th 2024 @ 01:00 PM ET

2025 ICD-10-CM Updates
Event Calendar

Our Accreditation Partner